Castletroy Limerick Pressure Washing & Flowerbed Maintenance Project
Castletroy, Limerick
July 2025
Areas covered: front and rear gardens.
Purpose of project: Customer wanted to have heavy staining and moss build-up removed from driveway and paths, along with de-weeding two severely overgrown flowerbeds.
Job duration: 1 day.